
III - 9
Preparing the Big Pack Baler
The big pack baler is equipped with its own on-board
hydraulic pump. It is flanged on to the upper rear area
of the main gearbox. The reservoir tank (2) is located
on the right hand side of the machine. Check the oil
level on the dip stick (1) every time before putting into
operation.
3.4.3 On-Board Hydraulics
•
Repairs to the hydraulics system may only be carried out by trained specialists.
•
High-pressure fluids from the hydraulics system can penetrate the skin and cause severe
injuries! Seek immediate medical attention in case of injury! Risk of infection!
Parking Brake
The crank (1) for the parking brake is located on the
left hand side of the big pack baler beneath the bale
channel. Before unhitching the machine, it must be
secured from unintentional rolling away using the
parking brake.
Electrical Connection Cables
The big pack baler requires an electrical supply for the
on-board computer. A socket to be mounted on the
tractor is part of the scope of supply. Plug the connect-
ion cables into the corresponding sockets on the baler
and secure them from coming loose.
Socket 1:
Connection cable between the on-board
computer and the control and indicator
box on the tractor. Remove the protective
cap before plugging in.
Socket 2:
Power supply for the on-board computer.
Socket 3:
Standard 7-pole socket for the lighting
system.
As soon as the constant current supply
plug has been plugged in and the control
and indicator box is switched on, and
there is no twine in the needles, the
acoustic signal for twine control sounds.
2
1
3
BP380-7-021
BP380-7-022
1
BP380-7-023
1
2
Summary of Contents for Big Pack 127 / MultiCut
Page 10: ...I 6 General Information ...
Page 15: ...II 5 Safety ...
Page 22: ...II 12 Safety ...
Page 46: ...IV 10 Comfort Controls ...
Page 70: ...VI 16 Settings ...
Page 90: ...X 2 ...
Page 92: ...XI 2 Putting into Operation Again ...
Page 114: ...XII 22 Special Equipment ...