Handbook OPTIFLEX 1300 C
OPTIFLEX
1300
C
18
Ø4mm or 0.15" single cable
Coaxial
Products with foam
The presence of foam (especially if highly conductive) may require the installation of a stilling well or bypass
chamber.
For further information, refer to section 1.3.3: Stilling wells and section 1.3.4: Bypass chambers.
Petroleum products
These products may be stocked in vessels with moving roofs. In this case install a stilling well according to
local standards, rules and regulations relative to the application and site. Refer also to section 1.3.3: Stilling
wells.
1.2.3
Solid Applications
Positioning nozzles on conical silos
Position the connection on the roof at ½ x tank radius and with minimum nozzle height. This will avoid
damage due to bending and traction when the tank is being emptied and also give reasonable
measurements.
Summary of Contents for optiplex 1300 c
Page 1: ......
Page 49: ...Handbook OPTIFLEX 1300 C 49 OPTIFLEX 1300 C 1 Volume measurement of liquids...
Page 50: ...Handbook OPTIFLEX 1300 C OPTIFLEX 1300 C 50 2 Volume measurement of solids...
Page 51: ...Handbook OPTIFLEX 1300 C 51 OPTIFLEX 1300 C 3 Mass measurement of liquids or solids...
Page 62: ...Handbook OPTIFLEX 1300 C OPTIFLEX 1300 C 62 Finding the advanced setup menu...
Page 95: ...Handbook OPTIFLEX 1300 C 95 OPTIFLEX 1300 C Note...