DRAFT
Field Service
V
er. 1.0 Feb. 2010
7. OTHER MAINTENANCE ITEM
79
bizhub C35
MAINTENANCE
7.4.29
Loop detection clutch (CL8)
1.
Remove the fuser unit.
2.
Remove the high voltage unit.
3.
Remove the ADF.
4.
Remove the scanner unit.
5.
Remove the rear right cover.
6.
Remove the cooling fan motor.
7.
Remove seven screws [1], and
remove the upper cover [2].
8.
Remove the screw [1], and remove
the exit drive assy [2].
9.
Disconnect three connectors [3].
A121F2C04
8
DA
[2]
[1]
[1]
A121F2C029DA
[1]
[2]
[3]
[3]
Summary of Contents for bizhub C35
Page 1: ...DRAFT SERVICE MANUAL 2010 02 2010 02 Ver 1 0 Ver 1 0 FIELD SERVICE ...
Page 3: ...DRAFT ii Blank Page ...
Page 28: ...DRAFT SERVICE MANUAL 2010 02 Ver 1 0 FIELD SERVICE Main body ...
Page 227: ...DRAFT 11 FAX PROTOCOLS Field Service Ver 1 0 Feb 2010 188 ADJUSTMENT SETTING Blank Page ...
Page 301: ...DRAFT 17 IC protector Field Service Ver 1 0 Feb 2010 262 Blank Page ...
Page 314: ...DRAFT SERVICE MANUAL 2010 02 Ver 1 0 FIELD SERVICE Lower Feeder Unit PF P08 ...
Page 317: ...DRAFT Lower Feeder Unit OUTLINE MAINTENANCE Field Service Ver 1 0 Feb 2010 ii Blank Page ...