![Konica Minolta bizhub 25e Field Engineering Manual Download Page 292](http://html1.mh-extra.com/html/konica-minolta/bizhub-25e/bizhub-25e_field-engineering-manual_1993091292.webp)
5-42
ROLLER TRANSFER ASSY/GUIDE TRANSFER
1. Open the Cover jam access [1].
2. Insert a thin driver and lift up the right and left shaft of the Roller transfer assy [2].
3. Remove the Roller transfer assy [2].
>@
>@
4. Remove two Rollers gap [4] and one Gear 25H 0.6 [5] from the Roller transfer ASSY [3], then remove two
Brackets transfer F [6].
[4]
[6]
[3]
[6]
[4] [5]
Summary of Contents for bizhub 25e
Page 1: ...bizhub 25e FIELD ENGINEERING MANUAL version 1 May 2013 DD1 91200 60 ...
Page 2: ......
Page 6: ...iv ...
Page 48: ...1 42 ...
Page 76: ...2 28 ...
Page 154: ...3 78 Second page of the report ...
Page 155: ...3 79 Third page of the report ...
Page 156: ...3 80 Fourth page of the report ...
Page 200: ...3 124 ...
Page 201: ...3 125 ...
Page 325: ...5 75 4 Install the ASSY SCRAPER 5 to the Drum unit 6 5 6 ...
Page 353: ......