![Konica Minolta bizhub 25e Field Engineering Manual Download Page 251](http://html1.mh-extra.com/html/konica-minolta/bizhub-25e/bizhub-25e_field-engineering-manual_1993091251.webp)
5-1
5 Maintenance & Adjustment
5.1 Maintenance schedule
Scanning Section
Parts Name
Maintenance Cycle (pages)
Reference
Page
Clean
Replace
Covers
Wipe it with a soft cloth dampened with water.
If that does not clean the part, wipe it first with a soft
cloth dampened with natural detergent, then wipe it
with a soft cloth dampened with water.
—
—
Touch panel display
—
—
ADF document pad
—
—
Document pad
—
—
ADF glass
Wipe it with a soft cloth dampened with water.
—
—
Document glass
—
—
Assy Piece Separator
*2
Wipe it with a soft cloth dampened with alcohol.
60,000 sheets/A4
or 2 years
Roller Separate
*2
60,000 sheets/A4
or 2 years
Roller Pickup
*2
60,000 sheets/letter
or 2 years
Roller Feed / Roller Press
—
—
Roller Exit / Roller Press
—
—
CIS
Wipe it with a dry soft cloth.
—
*1 Replace these parts at the same time.
Printer Section
Parts Name
Maintenance Cycle (pages)
Reference
Page
Clean
Replace
Print head
Wipe it with a soft cloth
dampened with alcohol.
—
Roller Pickup
*2
100,000 sheets/A4 or 2 years
Pad Pressure CST
*2
100,000 sheets/A4 or 2 years
Roller Feed OP
100,000 sheets/A4
Roller Duplex
300,000 sheets/A4
Roller Pickup MP
100,000 sheets/A4 or 2 years
Pad Pressure MP
100,000 sheets/A4 or 2 years
Roller Resist
100,000 sheets/A4
Roller Exit
100,000 sheets/A4
Inter roller
—
2-bin roller
—
300,000 sheets/A4
—
Fuser
—
100,000 sheets/A4
Roller Transfer
—
100,000 sheets/A4
Guide Transfer
—
100,000 sheets/A4
Filter Ozone
—
150,000 sheets/A4
*2 Replace these parts at the same time.
Note
The maintenance cycle (pages or years) may be shorter than the above value according to the
environment or usage of the machine, and the documents and paper that are used. The maintenance
cycle (pages or years) are not insured and early replacement of the parts may be needed to maintain
the machine quality.
Summary of Contents for bizhub 25e
Page 1: ...bizhub 25e FIELD ENGINEERING MANUAL version 1 May 2013 DD1 91200 60 ...
Page 2: ......
Page 6: ...iv ...
Page 48: ...1 42 ...
Page 76: ...2 28 ...
Page 154: ...3 78 Second page of the report ...
Page 155: ...3 79 Third page of the report ...
Page 156: ...3 80 Fourth page of the report ...
Page 200: ...3 124 ...
Page 201: ...3 125 ...
Page 325: ...5 75 4 Install the ASSY SCRAPER 5 to the Drum unit 6 5 6 ...
Page 353: ......