SAFETY
PRECAUTION DURING OPERATION
35
WARNING: Failure to follow these safety precautions may lead to a serious accident.
OPERATIONS ON SLOPES
●
When working on slopes, there is danger that the machine
may lose its balance and turn over when the swing or work
equipment are operated. Always carry out these operations
carefully.
●
Do not swing the work equipment from the uphill side to the
downhill side when the bucket is loaded. This operation is
dangerous.
(See the upper diagram on the right.)
●
If the machine has to be used on a slope, pile the soil to make
a platform that will keep the machine as horizontal as possi-
ble.
(See the lower diagram on the right.)
Piled soil on slope, see "PRECAUTIONS WHEN TRAVEL-
LING UP OR DOWN HILLS (186)"
INCORRECT
Platform
CORRECT
Summary of Contents for PW160-7K Series
Page 2: ......
Page 3: ...3 FOREWORD ...
Page 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Page 20: ...20 ...
Page 222: ...TROUBLESHOOTING OPERATION 222 ...
Page 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Page 305: ...305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Page 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Page 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Page 357: ......