INTRODUCTION OF ATTACHMENTS AND EXTENDING MACHINE SERVICE LIFE
OPTIONS, ATTACHMENTS
344
Shape of ditch 38° bucket
How to perform excavation
Operate the boom, the arm and the bucket to make the line A of
the side-plate of the bucket vertical.
To check this position guide plate B is installed beside the bucket
pins.
Hold this plate horizontal when digging.
Summary of Contents for PW160-7K Series
Page 2: ......
Page 3: ...3 FOREWORD ...
Page 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Page 20: ...20 ...
Page 222: ...TROUBLESHOOTING OPERATION 222 ...
Page 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Page 305: ...305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Page 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Page 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Page 357: ......