SERVICE PROCEDURE
MAINTENANCE
248
SERVICE PROCEDURE
INITIAL 250 HOURS SERVICE
Carry out the following maintenance only after the first 250
hours.
●
REPLACE FUEL FILTER CARTRIDGE
For details, see "REPLACE FUEL FILTER CARTRIDGE
(287)"
●
CHECK ENGINE VALVE CLEARANCE, ADJUST
For details, see "CHECK ENGINE VALVE CLEARANCE,
ADJUST (248)"
For details of the method of replacing or maintaining, see
the section on EVERY 500 HOURS and 2000 HOURS SER-
VICE.
●
CHANGE OIL IN TRANSMISSION, HUBS + AXLES.
Summary of Contents for PW160-7K Series
Page 2: ......
Page 3: ...3 FOREWORD ...
Page 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Page 20: ...20 ...
Page 222: ...TROUBLESHOOTING OPERATION 222 ...
Page 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Page 305: ...305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Page 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Page 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Page 357: ......