MAINTENANCE
SERVICE PROCEDURE
285
2.
Loosen nut (5) attached to fixed bracket (3), and then tighten
bolt (6).
❍
Tighten bolt (6) so that the deflection of the belt will be
5 ~ 8 mm (approx. 58.8N (6kgf)
3.
Tighten bolts (1) and (2) to secure bracket (4).
4.
Loosen bolt (6) to remove from bracket (4).
5.
Tighten nut.
6.
Check for damage to the pulleys, and wear of the V-groove
and V-belt. Be particularly careful to check that the V-belt is
not in contact with the bottom of the V-groove.
7.
If the belt has elongated and there is no more allowance for
adjustment, or if the belt is cut or cracked, replace the belt.
8.
After replacing the V-belt, operate for one hour, then adjust
again.
Summary of Contents for PW160-7K Series
Page 2: ......
Page 3: ...3 FOREWORD ...
Page 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Page 20: ...20 ...
Page 222: ...TROUBLESHOOTING OPERATION 222 ...
Page 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Page 305: ...305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Page 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Page 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Page 357: ......