OPERATION
OPERATIONS AND CHECKS BEFORE STARTING ENGINE
169
3.
Turn fuel control dial to the mid-range speed position and turn
swing lock switch ON.
4.
Lower safety lock lever to the UNLOCK position, put control
lever lock switch to OFF position and raise the bucket from
the ground.
5.
Operate boom and bucket control lever and arm control lever
slowly to operate the boom cylinder, bucket cylinder, and arm
cylinder to the end of their stroke.
6.
Operate the boom and arm slowly at the same time, and
repeat this for 30 seconds.
Next, repeat the same operation with the bucket and swing
for 30 seconds. Operate both fully in turn for 5 minutes.
NOTICE
When pulling in the work equipment, be careful not to let
it hit the chassis or ground.
7.
Turn fuel control dial to the full speed (MAX) position and
carry out the operation is Step 6 for 3 -5 minutes.
8.
Repeat the following operation 3 - 5 times and operate slowly.
●
Boom operation RAISE
↔
LOWER
●
Arm operation IN
↔
OUT
●
Bucket operation CURL
↔
DUMP
●
Swing operation LEFT
↔
RIGHT
●
Travel (Lo) operation FORWARD
↔
REVERSE
NOTICE
When the hydraulic oil is at a low temperature the
machine travel function may have very slow operation.
Always carry out the warming up operation before travelling
to ensure correct function of the travel system and help
extend the life of the machine.
OFF
ON
LOCK
UNLOCK
Control
lever
lock switch
MAX
Summary of Contents for PW160-7K Series
Page 2: ......
Page 3: ...3 FOREWORD ...
Page 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Page 20: ...20 ...
Page 222: ...TROUBLESHOOTING OPERATION 222 ...
Page 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Page 305: ...305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Page 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Page 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Page 357: ......