
KRD-10
Chapter 7 Installation
0093170212-01 7-1
Chapter 7 Installation
7.1 Installation consideration
Qualified service technicians should perform the installation of the KRD-10 that comprises the following
operations.
(1) Unpacking each component of the system.
(2) Inspection of the exterior of each component unit and accessory.
(3)
Checking the ship’s mains voltage and current capacity.
(4) Determining the installation site
(5) Installing the Display unit
(6) Planning the cable routing and connections
(7) Adjustment and setups
7.2 Unpacking of the goods
Unpack your package and check if all of the items stated in the packing list are contained in the
package.
If there is any trouble in the contents, please contact your dealer or our office.
No.
Name of item
Type
Remark
Qty
1
Display unit
KRD-10.MU
With mounting bracket, hard
cover and BNC connector
cap
1
2
DC power cable
CW-276-2M
With a 5-pin connector and
one end plain
1
3
Connecting cable
CW-376-1-5M
With a 6-pin connector and
one end plain
(with ferrite core)
1
4
Installation material
TPT5X20U
Truss tapping screw
4
5
Operation Manual
KRD-10.OM.E
English
1
Note:
Option of equipment is not included.
7.2.1 Inspection of the goods
Carefully check the exterior of each component unit for dents, damage, etc. Also check the inside of
component units for electrical and mechanical damages.
Summary of Contents for KRD-10
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 18: ... This page intentionally left blank ...
Page 36: ... This page intentionally left blank ...
Page 54: ...Chapter 2 Various Navigation KRD 10 2 18 0093170212 01 3 Press key to display T RNG and T TTG ...
Page 66: ... This page intentionally left blank ...
Page 106: ... This page intentionally left blank ...
Page 124: ... This page intentionally left blank ...
Page 129: ......
Page 130: ......