Model 2701 Service Manual
Performance Verification
1-3
Verification test requirements
Be sure that you perform the verification tests:
•
Under the proper environmental conditions.
•
After the specified warm-up period.
•
Using the correct line voltage.
•
Using the proper calibration equipment.
•
Using the specified reading limits.
Environmental conditions
Conduct your performance verification procedures in a test environment that has:
•
An ambient temperature of 18° to 28°C (65° to 82°F).
•
A relative humidity of less than 80% unless otherwise noted.
Warm-up period
Allow the Model 2701 to warm up for at least two hours before conducting the verification
procedures.
If the instrument has been subjected to temperature extremes (those outside the ranges stated
above), allow additional time for the instrument’s internal temperature to stabilize. Typically,
allow one extra hour to stabilize a unit that is 10°C (18°F) outside the specified temperature
range.
Also, allow the test equipment to warm up for the minimum time specified by the
manufacturer.
Line power
The Model 2701 requires a line voltage of 100V/120V/220V/240V ±10% and a line
frequency of 45Hz to 66Hz or 360Hz to 440Hz. Note that the line frequency is automatically
sensed at power-up, but the line voltage must be manually set to either 100V/120V or
220V/240V as described in
Section 3
.
Summary of Contents for 2701
Page 15: ...1 PerformanceVerification...
Page 47: ...2 Calibration...
Page 70: ...3 RoutineMaintenance...
Page 78: ...4 Troubleshooting...
Page 97: ...5 Disassembly...
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ...6 ReplaceableParts...
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ...A Specifications...
Page 140: ...B CalibrationReference...