
Operation Manual ServoOne Supply Unit
65
ID no.: 1101.21B.6-00 Date: 04/2020
5.3 Diagnostics
5.3.1
Malfunctions and warnings in DriveManager 5
The parameters P-0031 ErrorStack and P-0033 ActualError contain additional
information on an error or warning that has occurred. You can obtain this information via
the "Device state monitor" in DriveManager 5.
NOTe:
You will find more detailed information in the Operation Manual ServoOne DC
Axis Controller.
If the brake chopper is operated (DC link voltage ≥820 V) the power converted in the
braking resistor is integrated.
P= (820 V)
2
MON_BrcR
If the brake chopper is not operated, the power is integrated using the value configured
in the parameters for the brake chopper rated power (MON_BrcPnom).
On reaching the shut-off threshold MON_BrcQmax a device error (ErrID=>24,
Location=>01) is triggered and the operation of the brake chopper inhibited.
NOTe:
Any pre-heating of the braking resistor is not taken into account!
5.2.10 Switching on mains supply voltage
NOTe:
Prior to switching on, check the wiring for correct phase angle.
9.
The mains can now be switched on using the main switch. Once the precharging
of the DC link has been completed, the indication on the display in the supply unit
changes from the value 1 to the value 2.
5.2.11 Switching on regulation
10.
After precharging the DC link, the regulation can be enabled by activating the
input ENPO (X4/10). The supply unit now synchronises the regulation with the
mains voltage. The display indicates the value 4 during this phase. After successful
synchronisation, the regulation becomes active and the stipulated setpoint for the
DC link voltage is set. The display indicates the value 5.
The actual DC link voltage measured is indicated via the parameter P-0332 in the
area "Parameter list > PSU status > Actual values > DC Voltage" in the parameter
tree. If, on average, this value corresponds to the stipulated setpoint, the supply
unit has been successfully placed in operation.
Commissioning
Summary of Contents for ServoOne Series
Page 6: ...Operation Manual ServoOne Supply Unit 6 ID no 1101 21B 6 00 Date 04 2020 Table of contents ...
Page 10: ...Operation Manual ServoOne Supply Unit 10 ID no 1101 21B 6 00 Date 04 2020 ...
Page 90: ...Operation Manual ServoOne Supply Unit 90 ID no 1101 21B 6 00 Date Date 04 2020 Glossary ...
Page 91: ...Operation Manual ServoOne Supply Unit 91 ID no 1101 21B 6 00 Date 04 2020 ...