Operation Manual ServoOne Supply Unit
59
ID no.: 1101.21B.6-00 Date: 04/2020
5
Commissioning
5.1 Notes for operation
CAUTION!
Damage to the device due to incorrect installation conditions!
The device may be irreparably damaged due to detrimental ambient
conditions during operation.
For this reason
• Moisture must not be allowed to enter the device
• There must not be any aggressive or conductive substances in the ambient air
• Foreign bodies such as drilling chips, screws, washers etc. must not be allowed to fall into
the device
• Cooling openings must not be covered, i.e. cooling air must be able to flow unhindered
through the device and the mains connection components.
Further information on ambient conditions can be found in the appendix.
5.2 Initial commissioning
(operation via terminals)
The commissioning of the supply unit is described in the following. During this process
the device is controlled via the control terminal X4. The setpoint for the DC link voltage is
specified internally as a fixed value. Commissioning is divided into the following steps:
DANGeR!
Risk of injury due to electrical power!
•
Carelessness will result in serious injuries or death.
Never make or disconnect electrical connections while they are electrically live! Before making
any change
the device is to be disconnected from the mains. Dangerously high voltages ≥50 V can be
present on the DC link connections and other components in the mains input area after power
off. So check that electrical power is not present! See chap. 4.1.
1.
Wiring the components
See chap. 4.3, p. 33 and subsequent information.
2.
Switch on control voltage
External 24-V supply voltage
See chap. 4.7.1, p. 44 BG5 and BG6a. See chap. 4.7.2, p. 45 BG7.
3.
Establish communication with DriveManager 5
You will find information on installation in the Installation Manual DriveManager
5 as well as in the online help.
4.
Adapt to the parameters for the supply system
5.
Automatic identification of the DC link capacitance and the equivalent time
constant for the current regulation
6.
Configure the controller parameters for the DC link capacitance
7.
Configure the controller parameters for the DC link voltage
8.
Set monitoring of the braking resistor
9.
Switch on the mains supply voltage via main switch
10.
Switch on the regulation
Start with ENPO set to HIGH.
Commissioning
Summary of Contents for ServoOne Series
Page 6: ...Operation Manual ServoOne Supply Unit 6 ID no 1101 21B 6 00 Date 04 2020 Table of contents ...
Page 10: ...Operation Manual ServoOne Supply Unit 10 ID no 1101 21B 6 00 Date 04 2020 ...
Page 90: ...Operation Manual ServoOne Supply Unit 90 ID no 1101 21B 6 00 Date Date 04 2020 Glossary ...
Page 91: ...Operation Manual ServoOne Supply Unit 91 ID no 1101 21B 6 00 Date 04 2020 ...