43
During initial start-up and when water temperature is low, it is important that the water is heated gradually. Failure to do so may
result in concrete floors cracking due to rapid temperature change. Please contact the responsible cast concrete building
contractor for further details.
To do so, the lowest water flow set temperature can be decreased to a value between 25°C and 35°C by adjusting the FOR
SERVICEMAN. Refer to
SPECIAL FUNCTION
.
Checks before initial start-up.
9.2 Initial start-up at low outdoor ambient temperature
9.3 Pre-operation checks
DANGER
Switch off the power supply before making any connections.
After the installation of the unit, check the following before switching on the circuit breaker:
Field wiring
:
Make sure that the field wiring between the local supply panel and unit and valves (when applicable),
unit and room thermostat (when applicable), unit and domestic hot water tank, and unit and backup heater kit have
been connected according to the instructions described in the chapter 8.8 "Field wiring", according to the wiring
diagrams and to local laws and regulations.
Fuses, circuit breakers, or protection devices Check that the fuses or the locally installed protection devices are of
the size and type specified in 13 "Technical specifications". Make sure that no fuses or protection devices have
been bypassed.
Backup heater circuit breaker
:
Do not forget to turn on the backup heater circuit breaker in the switchbox (it
depends on the backup heater type). Refer to the wiring diagram.
Booster heater circuit breaker
:
Do not forget to turn on the booster heater circuit breaker (applies only to units with
optional domestic hot water tank installed).
Ground wiring
:
Make sure that the ground wires have been connected properly and that the ground terminals are
tightened.
Internal wiring
:
Visually check the switch box for loose connections or damaged electrical components.
Mounting
:
Check that the unit is properly mounted, to avoid abnormal noises and vibrations when starting up the unit.
Damaged equipment
:
Check the inside of the unit for damaged components or squeezed pipes.
Refrigerant leak
:
Check the inside of the unit for refrigerant leakage. If there is a refrigerant leak, call your local dealer.
Power supply voltage
:
Check the power supply voltage on the local supply panel. The voltage must correspond to the voltage
on the identification label of the unit.
Air purge valve
:
Make sure the air purge valve is open (at least 2 turns).
Shut-off valves
:
Make sure that the shut-off valves are fully open.
44
The pump is contolled via a digital low-voltage pulse-width modulation signal which means that the
speed of rotation depends on the input signal.The speed changes as a function of the input profile.
The relationships between the head and the water flow rated,the PMW Return and the water flow
rated are shown in the graph below.
9.4 Setting the pump
The internal pump maintains maximum output, the indoor unit can provide the head and flow:
Available external static pressure VS Flow rate
0
10
20
30
40
50
60
70
80
90
0.3
0.6
0.9
1.2
1.5
1.8
2.1
2.4
2.7
3.0
ES
P
(
K
Pa
)
Q
(
m
3
/h
)
Available external static pressure VS Flow rate
Indoor unit 160
0
10
20
30
40
50
60
70
80
90
0.3
0.7
1.1
1.5
1.9
2.3
2.7
3.1
ES
P
(
K
Pa
)
Q
(
m
3
/h
)
Indoor unit 60
,
100
CAUTION
If the valves are at the incorrect position, the circulation pump will be damaged.
DANGER
If it's necessary to check the running status of the pump when unit power on, please do not touch the internal electronic
control box components to avoid electric shock.
121
120
Summary of Contents for KMK-100RY1
Page 1: ...INSTRUKCJA INSTALACYJNA INSTALATIONMANUAL POMPA CIEPŁA SPLIT SPLIT TYPE HEAT PUMP PL EN ...
Page 2: ......
Page 74: ......
Page 148: ...kaisai com ...