91
05.10 EN
Twin operation
Requirements
– To prepare the truck for operation, (see "Preparing
the truck for operation" on page 72)
Procedure
• To lower the load handler and tilt the mast forward
at the same time, push the Multi Pilot forward and
to the right.
• To lift the load handler and tilt the mast back at the
same time, push the Multi Pilot back and to the left.
• To lower the load handler and tilt the mast back at the same time, push the Multi
Pilot forward and to the left.
The mast is now tilted back / forward.
Positioning the integrated sideshift (option)
Requirements
– Truck prepared for operation, (see "Preparing the
truck for operation" on page 72).
Procedure
• Press the (148) button to move the load handler to
the right (from the driver's viewpoint).
• Press the (149) button to move the load handler to
the left (from the driver's viewpoint).
The sideshifter is now positioned.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
148
149
Summary of Contents for DFG 316s
Page 3: ...05 10 EN 4...
Page 9: ...05 10 EN 10...
Page 13: ...05 10 EN 14...
Page 21: ...05 10 EN 22...
Page 31: ...05 10 EN 32...
Page 37: ...05 10 EN 38...
Page 127: ...05 10 EN 128...
Page 175: ...05 10 EN 176 Z 1 LED optional equipment t Series equipment o Optional equipment...
Page 187: ...05 10 EN 188...