05.10 EN
88
Tilting the mast forward / backward
Requirements
– To prepare the truck for operation, (see
"Preparing the truck for operation" on
page 72)
Procedure
• Pull the Solo-Pilot lever (145) in direction R to
tilt the mast back.
• Push the Solo-Pilot lever (145) in direction V
to tilt the mast forward.
The mast is now tilted back / forward.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
Positioning the integrated sideshift (option)
Requirements
– To prepare the truck for operation, (see
"Preparing the truck for operation" on
page 72)
Procedure
• Pull the Solo-Pilot lever (146) in direction R to
move the load handler to the right (from the
driver’s viewpoint).
• Push the Solo-Pilot lever (146) in direction V
to move the load handler to the left (from the
driver’s viewpoint).
The sideshifter is now positioned.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
R
V
145
R
V
146
Summary of Contents for DFG 316s
Page 3: ...05 10 EN 4...
Page 9: ...05 10 EN 10...
Page 13: ...05 10 EN 14...
Page 21: ...05 10 EN 22...
Page 31: ...05 10 EN 32...
Page 37: ...05 10 EN 38...
Page 127: ...05 10 EN 128...
Page 175: ...05 10 EN 176 Z 1 LED optional equipment t Series equipment o Optional equipment...
Page 187: ...05 10 EN 188...