NEW DAILY
–
CHASSIS INTERVENTIONS
CHASSIS INTERVENTIONS
2.15
WORK ON THE BRAKING SYSTEM
51
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
Note
If there are new springs, prior to adjustment make sure that the rear suspension has settled correctly.
To do this, partially load the vehicle (about 2/3 of maximum limit), drive over bumpy ground and brake several times in forward
and reverse gear.
●
Connect pressure gauge
(1)
and
(2)
to the pressure sockets up-line and down-line of the corrector using the test couplings
(3)
.
●
Slacken coupling screw
(8)
on corrector adjustment lever
(7)
.
●
Apply to hole
(9)
the specific adjustment load for each model and each spring, after having loaded the drive axle to the refer-
ence value (see Table 2.19).
Table 2.19
Models
Rear leaf spring
Type
Load on lever used for
adjustment [kg]
Load on ground for reference
on rear axle [kg]
35C
semi-elliptical
3.5
1500
●
Tighten the coupling screw
(8)
to the prescribed torque (16÷19 Nm).
●
Operate the brake pedal until the circuit up-line of the control pressure corrector reaches 100 bar.
●
Check that the outlet pressure reaches the value indicated on the plate, corresponding to the ground mass attained.
102436
Figure 32
1.
Pressure gauge up-line of the corrector
2.
Pressure gauge down-line of the corrector
3.
Test couplings
4.
Load sensing valve
5.
Rod
6.
Main lever
7.
Adjustment lever
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...