8
NEW DAILY
–
ADBLUE AND SCRT SYSTEM
ADBLUE AND SCRT SYSTEM
6.3
INSTRUCTIONS
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
AdBlue refuelling filler
The filler assembly consists of:
●
a filler with a specific plug for AdBlue filler nozzles, a filter and a magnet for opening the nozzle valve;
●
a pipe connecting the filler to the tank breather.
if the filler door on the bodywork is modified, best possible access to the plug must be maintained.
The following points are mandatory since AdBlue crystallises at -11
°
C:
●
ensure the pipe is at an incline which prevents urea from collecting (syphons) inside;
●
respect the original incline of the filler in relation to the ground; any variation in this value must be authorized by IVECO.
Note
The parts in plastic must be at least 200 mm from any heat source (eg. exhaust system); if heat-protecting panels are used this
distance can be reduced to 80 mm.
Moving AdBlue system components
208932
Figure 3
1.
SCR catalytic converter
2.
Pumping module (SM)
3.
AdBlue tank
4.
AdBlue refuelling inlet
5.
AdBlue delivery pipe
6.
DPF Particulate filter
7.
Dosing module (DM)
If it is necessary to move the AdBlue tank for outfitting needs, this must be done making sure that the installation heights module of
the SM module and the pipes respect the conditions illustrated in Figure 5.
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...