GENERAL SPECIFICATIONS
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
In full compliance of the Manufacturer's transmission specifications, the kinematic forces from the power take-off to the relevant
apparatus should be carefully considered (angles, rpm, moment) during the design phase as well as the dynamic behaviour in the
installation phase.
This means that:
●
the dimensions should take into consideration the forces which might occur under maximum power and torque conditions;
●
to ensure effective kinetic forces, the shaft ends must be at the same angle (see Figure 1), and this angle must not exceed 7
°
;
●
solution Z is preferred to solution W due to the lower loads on the bearings of the power take-off and the equipment being
driven. When it is necessary to obtain a different transmission line with spatial inclinations according to angle
φ
(as shown in
Figure 2), it is important to remember that the kinetic forces of the assembly can only be ensured if the intermediate section
has forks offset by the same angle
φ
and if equal conditions are respected between the angles at the extremities
Χ
1
and
Χ
2
.
For transmissions employing multiple sections, please refer to the indications provided in Chapter 2.8 (
192350
Figure 1
Solution Z
Solution W
91523
Figure 2
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...