12
NEW DAILY
–
DAILY CNG AND CNG WITH "RECOVERY MODE"
DAILY CNG AND CNG WITH "RECOVERY MODE"
B.3
SYSTEM INTERVENTIONS
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
Partial discharge
208204
Figure 7
1.
Pressure reducer
2.
High gas pressure pipes
3.
Cylinder
4.
VBE solenoid valve
5.
Tap
A.
Open tap
C.
Closed tap
▶
This operation only guarantees ventilation of the system downstream of the gas cylinders.
Therefore it is imperative to avoid performing operations that could generate sparks (welding,
cutting, grinding, drilling) or involve the use of electrically powered equipment or open flames,
at a distance of less than 5 m from the cylinders.
●
Shut off power to the vehicle's electrical system at the master power switch (if present).
●
Disconnect cables from the battery.
●
Ground the vehicle.
●
Check that the cocks
(5)
of the solenoid valves
(4)
on all the cylinders
(3)
are closed: cock
(5)
set to
C
.
●
Disconnect the gas delivery pipe
(2)
from the pressure reducer
(1)
working slowly and paying attention to the effects of gas
pressure in the pipes.
●
Connect a rubber pipe (compatible with CNG) to the gas delivery pipe
(2)
to dispose of the gas, the free end of the pipe
must be at least 5 m from any source of flame or spark.
During this operation the rapid decompression can result in icing. Pay attention.
●
Check that the pressure in the system is null.
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...