Bleeding
Half open the valve cocks
(5)
(see Figure 7).
▶
This allows the pressurised gas to enter the pipes: take maximum care. After emptying, ensure
that the engine cannot be started.
If, after total discharge, the VBE valves are not scheduled for replacement, refit the disassembled parts or their replacements as
described in the following paragraph.
Inserting the mobile equipment of the solenoid valve
87391
Figure 12
●
Fit the piston
(3)
into the shutter
(5)
and secure it with the pin
(4)
.
●
Fit and push the spring
(2)
completely into the seat inside the piston
(3)
.
●
Fit the complete assembly into the coil shaft
(1)
with the conical end of the shutter
(5)
facing outwards.
●
Check that the O-Ring is fitted to the shaft
(1)
and in good condition.
87392
Figure 13
●
Fit and screw in the coil shaft ring nut tightening it to a torque of 28 Nm.
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...