NEW DAILY
–
GENERAL INFORMATION
GENERAL INFORMATION
1.8
GUARANTEES
7
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
191319
Figure 1
1.
IVECO
2.
Dealer
3.
Bodybuilder
4.
Customer
Based on this Directive, IVECO (main vehicle manufacturer) and a Bodybuilder intending to launch the multi-stage approval process
must sign a specific Collaboration Contract, called
Technical Agreement
, which sets out the content and reciprocal obligations in
detail.
Consequently:
1.
IVECO has the responsibility of providing, in the agreed form, the approval documents (EC/ECE approvals) and the technical
information necessary for the proper implementation of the fitting and/or transformation (manuals, drawings, specifications);
2.
the Bodybuilder has the following responsibilities:
■
the design and implementation of modifications to the basic vehicle received from IVECO,
■
reattainment of approvals of systems already approved in a previous stage when, due to changes on the basic vehicle the
approvals need to be updated,
■
compliance with national/international laws and in particular the laws of the destination country, for all changes made,
■
presentation of the changes made to a technical service, for evaluation,
■
appropriate documentation of the changes made, in order to give objective evidence of compliance to the aforemen-
tioned provisions of law (e.g. approval documents/test reports).
Before signing the
Technical Agreement
IVECO reserves the right to visit the Bodybuilder, in order to verify qualifications to carry
out the fittings and/or processing for which the above collaboration is requested.
The contents of the
Technical Agreement
can be evaluated in detail upon request to the Manager for relations with the Bodybuilder
for the single Market.
1.8
GUARANTEES
The guarantee that the work has been performed to standard must be given by the Bodybuilder who made the superstructure or
modifications to the chassis, in full compliance with the instructions in these Guidelines.
IVECO reserves the right to void the guarantee on the vehicle, if:
●
unauthorised fittings or transformations have been carried out;
●
a chassis not suitable for the fitting or intended use has been used;
●
the standards, specifications and instructions, provided by IVECO for proper execution of the work, have not been respected;
●
original spare parts or components made available by IVECO for specific operations have not been used;
●
safety regulations have not been respected;
●
the vehicle is used for purposes other than those for which it was designed.
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...