Chapter 6 • Disassembly and Sterilization of CUSA
®
NXT After Surgery •
79
Maintaining the Handpieces
In addition to the post-operative care of the CUSA NXT System described on
pages 73 and 75, further maintenance steps recommended by the
manufacturer are as follows:
General Maintenance
At 6 Month Intervals
1.
Remove and replace the contamination guard every six months, or when
the filter changes color (part # NXT00005). Remove and replace silicone
hose that connects the suction port on the Service Module to the waste
canisters.
2.
Examine all shroud sections and replace if damaged.
3.
Examine all cable and electrical connectors for signs of excessive wear
and damage, and replace if damaged.
Contact Integra Service Center for information on replacing parts.
Preventive Maintenance
At 12 Month Intervals
Integra service personnel should undertake preventative maintenance. In
addition to complete cleaning, performance and safety checks on the
Console, Service Module, Footswitch and handpieces should be carried out.
Full details of these checks are available from the manufacturer or supplier.
Contact Integra Service Center for information on returning equipment for
service.
Warning
No modification of this equipment is allowed.
Summary of Contents for CUSA NXT
Page 3: ...This page is intentionally left blank...
Page 7: ...iv This page is intentionally left blank...
Page 39: ...32 Chapter 2 CUSA NXT System Setup and Components This page is intentionally left blank...
Page 73: ...66 Chapter 4 Preparing the CUSA NXT for Surgery This page is intentionally left blank...
Page 79: ...72 Chapter 5 Operating the CUSA NXT During Surgery This page is intentionally left blank...
Page 95: ...88 Chapter 7 Troubleshooting the CUSA NXT System This page is intentionally left blank...
Page 105: ...98 Appendix A Technical Specifications This page is intentionally left blank...
Page 113: ...106 Index This page is intentionally left blank...