Removing and installing port and application blades 69
Time and items required .
.
.
.
.
.
.
.
. 70
Removing a blade .
.
.
.
.
.
.
.
.
.
. 70
Installing a blade
.
.
.
.
.
.
.
.
.
.
. 71
Removing and installing blade filler panels .
.
.
. 72
Removing a filler panel .
.
.
.
.
.
.
.
. 72
Installing a filler panel.
.
.
.
.
.
.
.
.
. 73
Removing and installing a CP8 control processor
blade
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 73
Time and items required .
.
.
.
.
.
.
.
. 74
Verifying the need for replacement
.
.
.
.
. 74
Recording critical SAN768B-2 information .
.
. 75
Removing a control processor blade (CP8) .
.
. 76
Installing a control processor blade (CP8) .
.
. 77
Verifying operation of the new CP blade.
.
.
. 78
Downloading firmware from an FTP server.
.
. 79
Downloading firmware from a USB drive .
.
. 81
Completing the CP8 blade replacement .
.
.
. 83
Removing and installing a core switch blade
(CR16-8)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 83
Time and items required .
.
.
.
.
.
.
.
. 84
Verifying the necessity of installation .
.
.
.
. 84
Removing a core switch blade (CR16-8) .
.
.
. 84
Installing a core switch blade (CR16-8) .
.
.
. 85
Removing and installing a power supply
.
.
.
. 86
Time and items required .
.
.
.
.
.
.
.
. 86
Removing a power supply .
.
.
.
.
.
.
. 86
Installing a power supply
.
.
.
.
.
.
.
. 87
Removing and installing a blower assembly
.
.
. 88
Time and items required .
.
.
.
.
.
.
.
. 88
Removing a blower assembly .
.
.
.
.
.
. 88
Installing a blower assembly.
.
.
.
.
.
.
. 89
Removing and installing a WWN bezel and WWN
card .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 89
Time and items required .
.
.
.
.
.
.
.
. 89
Verifying the need for replacement
.
.
.
.
. 90
Removing the WWN bezel and WWN card.
.
. 90
Installing the WWN bezel and WWN card .
.
. 91
Removing and installing transceivers .
.
.
.
.
. 92
Time required
.
.
.
.
.
.
.
.
.
.
.
. 92
Items required
.
.
.
.
.
.
.
.
.
.
.
. 92
Removing and installing an SFP+ optical
transceiver.
.
.
.
.
.
.
.
.
.
.
.
.
. 92
Removing and installing an mSFP optical
transceiver.
.
.
.
.
.
.
.
.
.
.
.
.
. 94
Removing and replacing inter-chassis link (QSFP)
cables .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 95
Time and items required .
.
.
.
.
.
.
.
. 97
Removing an inter-chassis link (QSFP) cable .
. 97
Installing an ICL cable .
.
.
.
.
.
.
.
.
. 97
Possible ICL configurations .
.
.
.
.
.
.
. 98
Removing the batteries .
.
.
.
.
.
.
.
.
. 100
Removing and replacing the chassis .
.
.
.
.
. 101
Verifying necessity of replacement .
.
.
.
. 102
Preparing for a chassis replacement .
.
.
.
. 102
Disconnecting the SAN768B-2 from the network
and fabric
.
.
.
.
.
.
.
.
.
.
.
.
. 105
Removing components from the chassis
.
.
. 106
Removing and replacing the chassis from the
cabinet
.
.
.
.
.
.
.
.
.
.
.
.
.
. 106
Installing components into the new chassis
.
. 107
Downloading the configuration .
.
.
.
.
. 108
Verifying the correct operation of the system
108
Reconnecting the system to the network and
fabric .
.
.
.
.
.
.
.
.
.
.
.
.
.
. 110
Verifying the correct configuration of the fabric
110
Cable routing tables .
.
.
.
.
.
.
.
.
. 111
Chapter 6. Installing new features
. . 115
FC3632, FC3648- Installing a 16-Gb port port blade
(32 or 48 ports) .
.
.
.
.
.
.
.
.
.
.
.
. 115
Time required .
.
.
.
.
.
.
.
.
.
.
. 115
Items required .
.
.
.
.
.
.
.
.
.
.
. 115
Procedures .
.
.
.
.
.
.
.
.
.
.
.
. 116
FC3864 - Installing an 8-Gb 64-port port blade .
. 117
Time required .
.
.
.
.
.
.
.
.
.
.
. 117
Items required .
.
.
.
.
.
.
.
.
.
.
. 117
Procedures .
.
.
.
.
.
.
.
.
.
.
.
. 117
FC3890 - Installing an FX8-24 extension blade
.
. 119
Time required .
.
.
.
.
.
.
.
.
.
.
. 119
Items required .
.
.
.
.
.
.
.
.
.
.
. 119
Procedures .
.
.
.
.
.
.
.
.
.
.
.
. 119
FC7871 - Installing a QSFP and inter-chassis license 120
Time required .
.
.
.
.
.
.
.
.
.
.
. 120
Items required .
.
.
.
.
.
.
.
.
.
.
. 120
Procedures .
.
.
.
.
.
.
.
.
.
.
.
. 120
Appendix A. Product specifications
123
General specifications
.
.
.
.
.
.
.
.
.
. 123
System architecture .
.
.
.
.
.
.
.
.
.
. 123
System size and weight .
.
.
.
.
.
.
.
.
. 126
Facility requirements .
.
.
.
.
.
.
.
.
.
. 126
Power specifications .
.
.
.
.
.
.
.
.
.
. 127
Environmental requirements .
.
.
.
.
.
.
. 128
Fibre channel port specifications .
.
.
.
.
.
. 128
Data transmission ranges
.
.
.
.
.
.
.
.
. 129
Power cords .
.
.
.
.
.
.
.
.
.
.
.
.
. 129
Appendix B. Application blades
. . . 131
FX8-24 blade
.
.
.
.
.
.
.
.
.
.
.
.
. 131
Appendix C. Diagnostics and
troubleshooting . . . . . . . . . . 133
Obtaining chassis and component status .
.
.
. 133
Interpreting POST and boot results .
.
.
.
.
. 134
POST .
.
.
.
.
.
.
.
.
.
.
.
.
.
. 134
Boot
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 135
Diagnostics .
.
.
.
.
.
.
.
.
.
.
.
.
. 135
Troubleshooting
.
.
.
.
.
.
.
.
.
.
.
. 135
Appendix D. Blade port numbering
139
Notices . . . . . . . . . . . . . . 143
Trademarks .
.
.
.
.
.
.
.
.
.
.
.
.
. 145
Electronic emission notices .
.
.
.
.
.
.
.
. 146
Federal Communications Commission (FCC)
Class A Statement .
.
.
.
.
.
.
.
.
.
. 146
Industry Canada Class A Emission Compliance
Statement
.
.
.
.
.
.
.
.
.
.
.
.
. 146
vi
SAN768B-2 Installation, Service, and User Guide
Summary of Contents for SAN768B-2
Page 2: ......
Page 10: ...viii SAN768B 2 Installation Service and User Guide...
Page 12: ...x SAN768B 2 Installation Service and User Guide...
Page 14: ...xii SAN768B 2 Installation Service and User Guide...
Page 26: ...xxiv SAN768B 2 Installation Service and User Guide...
Page 30: ...xxviii SAN768B 2 Installation Service and User Guide...
Page 96: ...66 SAN768B 2 Installation Service and User Guide...
Page 144: ...114 SAN768B 2 Installation Service and User Guide...
Page 152: ...122 SAN768B 2 Installation Service and User Guide...
Page 168: ...138 SAN768B 2 Installation Service and User Guide...
Page 180: ...150 SAN768B 2 Installation Service and User Guide...
Page 185: ......
Page 186: ...Part Number 99Y0730 Printed in USA GA32 0893 00 1P P N 99Y0730...