Contents
Read this first . . . . . . . . . . . . iii
Getting help .
.
.
.
.
.
.
.
.
.
.
.
.
. iii
Taiwan Contact Information .
.
.
.
.
.
.
. iii
How to send your comments
.
.
.
.
.
.
.
. iv
Figures . . . . . . . . . . . . . . . ix
Tables . . . . . . . . . . . . . . . xi
Safety and environmental notices . . . xiii
Safety notices and labels .
.
.
.
.
.
.
.
.
. xiii
Danger notices .
.
.
.
.
.
.
.
.
.
.
. xiii
Caution notices .
.
.
.
.
.
.
.
.
.
.
. xvi
Safety labels
.
.
.
.
.
.
.
.
.
.
.
. xviii
Attention notices .
.
.
.
.
.
.
.
.
.
. xix
Rack safety
.
.
.
.
.
.
.
.
.
.
.
.
.
. xx
Rack installation .
.
.
.
.
.
.
.
.
.
.
. xx
Rack relocation (19" rack)
.
.
.
.
.
.
.
. xxi
Safety inspections .
.
.
.
.
.
.
.
.
.
.
. xxii
Removing ac power .
.
.
.
.
.
.
.
.
. xxii
External machine checks
.
.
.
.
.
.
.
. xxii
Internal machine checks .
.
.
.
.
.
.
.
. xxii
Product recycling and disposal .
.
.
.
.
.
. xxiii
About this document . . . . . . . . xxv
Who should read this document .
.
.
.
.
.
. xxv
Product documents .
.
.
.
.
.
.
.
.
.
. xxv
Brocade documents .
.
.
.
.
.
.
.
.
.
. xxv
IBM and Brocade product matrix
.
.
.
.
. xxvi
Accessibility features for SAN768B-2 .
.
.
. xxvi
Chapter 1. Introduction . . . . . . . . 1
Overview of the SAN768B-2 .
.
.
.
.
.
.
.
. 1
Hardware components .
.
.
.
.
.
.
.
.
.
. 3
SAN768B-2 blades
.
.
.
.
.
.
.
.
.
.
.
. 5
High availability .
.
.
.
.
.
.
.
.
.
.
.
. 7
Reliability .
.
.
.
.
.
.
.
.
.
.
.
.
.
. 8
Serviceability .
.
.
.
.
.
.
.
.
.
.
.
.
. 8
Software features .
.
.
.
.
.
.
.
.
.
.
.
. 8
Security .
.
.
.
.
.
.
.
.
.
.
.
.
.
. 9
Network Manageability .
.
.
.
.
.
.
.
. 10
Chapter 2. Installing and removing a
SAN768B-2 . . . . . . . . . . . . . 11
Ordering the lift tool .
.
.
.
.
.
.
.
.
.
. 12
World trade locations .
.
.
.
.
.
.
.
.
. 12
United States locations
.
.
.
.
.
.
.
.
. 12
Installation guidelines .
.
.
.
.
.
.
.
.
.
. 13
Installing a SAN768B-2 in a cabinet .
.
.
.
.
. 14
Time required
.
.
.
.
.
.
.
.
.
.
.
. 14
Tools required
.
.
.
.
.
.
.
.
.
.
.
. 15
Parts list .
.
.
.
.
.
.
.
.
.
.
.
.
. 15
Unpacking the SAN768B-2 .
.
.
.
.
.
.
. 17
Attaching the shelf brackets .
.
.
.
.
.
.
. 18
Removing the chassis door and cable
management comb .
.
.
.
.
.
.
.
.
.
. 19
Using the lift tool, the 24–inch load plate, and the
bridge tool
.
.
.
.
.
.
.
.
.
.
.
.
. 20
Port numbering .
.
.
.
.
.
.
.
.
.
.
.
. 26
Chassis slots .
.
.
.
.
.
.
.
.
.
.
.
.
. 27
Cable organization .
.
.
.
.
.
.
.
.
.
.
. 27
Removing a SAN768B-2 from the cabinet
.
.
.
. 29
Chapter 3. Starting and configuring the
SAN768B-2 . . . . . . . . . . . . . 31
Providing power to the SAN768B-2 .
.
.
.
.
. 33
Establishing a serial connection and logging on to
the SAN768B-2 .
.
.
.
.
.
.
.
.
.
.
.
. 33
Logging in to the serial console port .
.
.
.
.
. 34
Configuring the IP addresses
.
.
.
.
.
.
.
. 34
Logging off the serial console port and
disconnecting the serial cable
.
.
.
.
.
.
.
. 35
Establishing an Ethernet connection .
.
.
.
.
. 36
Customize a switch name
.
.
.
.
.
.
.
.
. 36
Customizing a chassis name .
.
.
.
.
.
.
.
. 36
Setting the Domain ID.
.
.
.
.
.
.
.
.
.
. 37
Setting the date and time .
.
.
.
.
.
.
.
.
. 37
Setting the date .
.
.
.
.
.
.
.
.
.
.
. 37
Setting the time zone .
.
.
.
.
.
.
.
.
. 37
Synchronizing local time .
.
.
.
.
.
.
.
. 38
Verifying the PID mode .
.
.
.
.
.
.
.
.
. 39
Determining installed software licenses .
.
.
.
. 39
Installing transceivers and attaching cables .
.
.
. 39
Managing cables.
.
.
.
.
.
.
.
.
.
.
.
. 42
Verifying correct operation and backing up the
configuration .
.
.
.
.
.
.
.
.
.
.
.
.
. 42
Fabric OS firmware updates .
.
.
.
.
.
.
.
. 43
Downloading and installing firmware
.
.
.
. 43
Powering off the SAN768B-2
.
.
.
.
.
.
.
. 44
Chapter 4. Monitoring system
components . . . . . . . . . . . . 45
Port or application blade status.
.
.
.
.
.
.
. 51
Control processor blade (CP8) status .
.
.
.
.
. 57
Core switch blade (CR16-8) status .
.
.
.
.
.
. 59
Power supply status
.
.
.
.
.
.
.
.
.
.
. 61
Blower assembly status
.
.
.
.
.
.
.
.
.
. 62
WWN bezel and WWN card status
.
.
.
.
.
. 64
Chapter 5. Removing and installing
components . . . . . . . . . . . . 67
Removing and installing the chassis door .
.
.
. 67
Time and items required .
.
.
.
.
.
.
.
. 67
Removing the chassis door .
.
.
.
.
.
.
. 67
Removing and installing a cable management comb 68
Time and items required .
.
.
.
.
.
.
.
. 68
Removing a cable management comb.
.
.
.
. 68
Installing a cable management comb .
.
.
.
. 69
© Copyright IBM Corp. 2011
v
Summary of Contents for SAN768B-2
Page 2: ......
Page 10: ...viii SAN768B 2 Installation Service and User Guide...
Page 12: ...x SAN768B 2 Installation Service and User Guide...
Page 14: ...xii SAN768B 2 Installation Service and User Guide...
Page 26: ...xxiv SAN768B 2 Installation Service and User Guide...
Page 30: ...xxviii SAN768B 2 Installation Service and User Guide...
Page 96: ...66 SAN768B 2 Installation Service and User Guide...
Page 144: ...114 SAN768B 2 Installation Service and User Guide...
Page 152: ...122 SAN768B 2 Installation Service and User Guide...
Page 168: ...138 SAN768B 2 Installation Service and User Guide...
Page 180: ...150 SAN768B 2 Installation Service and User Guide...
Page 185: ......
Page 186: ...Part Number 99Y0730 Printed in USA GA32 0893 00 1P P N 99Y0730...