Unpacking and transporting the device
About this task
Use the following procedure to unpack and install your device.
DANGER
A fully populated chassis weighs approximately 145.83 kg (321.5 lbs) and
requires a hydraulic or assisted lift to install it.
If a lift tool with a capacity of at least 350 lb is not available, the director
chassis must be depopulated completely before installing it into the rack.
Note any possible interconnecting cables so that you will be able to reconnect
them correctly. Remove the power supplies, fan modules, all of the blades,
the cable management comb, and the chassis door (if equipped). Install the
empty chassis into the rack following the chassis installation instructions.
The weight of the empty chassis is 78.5 lb (35.6 kg) and must be lifted by
minimum 3 people. After securing the chassis to the rack, reinstall the power
supplies, fan modules, the blades and any possible interconnecting cables
and proceed with the installation.
Procedure
1.
Unpack the device.
a.
Cut the bands that encircle the packaging.
b.
Open the top of the shipping box and remove accessory kit, rack mount
kits, and foam from the top of the device.
c.
Lift the cardboard shipping container and inner cardboard sleeve off the
device.
d.
Remove the antistatic plastic off the device.
e.
Leave the device on top the foam shipping tray and wood pallet if the
device must be transported to the installation location.
f.
Verify the contents of the shipping carton by referring to “Items shipped”
on page 15.
g.
Save foam packing material and wooden pallet for reuse.
2.
Use a pallet jack or other assisted lift to transport the device to the installation
area. Doorways must be wider than 36 in. (91 cm) to accommodate the device.
3.
Remove the chassis door if installed.
4.
Remove the cable management comb if attached to the device.
5.
Use a lift to raise the device to the correct level. Use two people, one to
operate the lift and the other to secure the device on the lift.
Note:
Do not attempt to lift the device by the protective cover attached to
over the air vents on the port side of the chassis.
Note:
Orient the device on the lift so that you can slide it into correct side of
rack to provide cool air intake. Fans and power supply FRUs in this device
have a green "E" or "I" symbol on the FRU faceplate. An "E" indicates that the
FRU pulls air from the port side of the device and exhausts out the nonport
side. An "I" indicates that the FRU pulls air from the nonport side of the
device and exhausts out the nonport side. Fans and power supplies must have
Chapter 3. Mounting the Device
19
Summary of Contents for SAN512B-6
Page 2: ......
Page 8: ...vi SAN512B 6 Installation Service and User Guide...
Page 10: ...viii SAN512B 6 Installation Service and User Guide...
Page 12: ...x SAN512B 6 Installation Service and User Guide...
Page 40: ...16 SAN512B 6 Installation Service and User Guide...
Page 60: ...36 SAN512B 6 Installation Service and User Guide...
Page 128: ...104 SAN512B 6 Installation Service and User Guide...
Page 140: ...116 SAN512B 6 Installation Service and User Guide...
Page 170: ...146 SAN512B 6 Installation Service and User Guide...
Page 184: ...160 SAN512B 6 Installation Service and User Guide...
Page 196: ...172 SAN512B 6 Installation Service and User Guide...
Page 208: ...184 SAN512B 6 Installation Service and User Guide...
Page 258: ...234 SAN512B 6 Installation Service and User Guide...
Page 274: ...250 SAN512B 6 Installation Service and User Guide...
Page 285: ......
Page 286: ...IBM Part Number 01JC152 Printed in USA SC27 8966 02 1P P N 01JC152...