b.
Open the top of the shipping box and remove accessory kit, rack mount
kits, and foam from the top of the chassis.
c.
Lift the cardboard shipping container and inner cardboard sleeve off the
chassis.
d.
Remove the antistatic plastic off the chassis.
e.
Save the packing materials for use when returning the old chassis.
f.
Leave the chassis on top the foam shipping tray and wood pallet if the
chassis must be transported to the installation location.
g.
Verify the contents of the shipping carton by referring to “Items shipped”
on page 15.
h.
Save foam packing material and wooden pallet for reuse.
4.
Use a pallet jack or other assisted lift to transport the new chassis to the
installation area. Doorways must be wider than 91 cm (36 in.) to accommodate
the chassis on the pallet.
5.
Use a lift to raise the chassis to the correct level. If installing the chassis in a
rack, follow the instructions provided by the rack kit manufacturer.
Installing components into the chassis
About this task
Follow electrostatic discharge (ESD) precautions when installing new components.
Wear a wrist grounding strap connected to chassis ground (if the device is plugged
in) or a bench ground.
DANGER
For safety reasons, the ESD wrist strap should contain a series 1
megaohm resistor.
Procedure
1.
Record the chassis serial number, SKU, and WWN printed on the chassis
label. This label is located on the upper portion of the chassis to the left of the
fan assemblies on the nonport side. You may need this information to transfer
licenses to the new chassis.
2.
Replace the fan assemblies (“Installing a fan assembly” on page 179).
3.
Replace the power supplies or filler panels (“Installing a power supply” on
page 169).
4.
Replace the control processor (CP) blades (“Replacing a CP blade” on page
134).
5.
Replace the core routing (CR) blades (“Installing a blade” on page 142).
6.
Replace the port and extension blades or filler panels (“Installing a blade” on
page 114 and “Installing a filler panel” on page 182).
7.
Replace the cable management comb (“Installing cable management comb” on
page 186).
8.
Replace the chassis door. The door is required to meet EMI compliance. Refer
to “Installing a chassis door” on page 188.
9.
Plug in power cords from power source into all installed power supplies to
power on device. Refer to (“Providing power to the device” on page 39).
Chapter 16. Replacing the Chassis
205
Summary of Contents for SAN512B-6
Page 2: ......
Page 8: ...vi SAN512B 6 Installation Service and User Guide...
Page 10: ...viii SAN512B 6 Installation Service and User Guide...
Page 12: ...x SAN512B 6 Installation Service and User Guide...
Page 40: ...16 SAN512B 6 Installation Service and User Guide...
Page 60: ...36 SAN512B 6 Installation Service and User Guide...
Page 128: ...104 SAN512B 6 Installation Service and User Guide...
Page 140: ...116 SAN512B 6 Installation Service and User Guide...
Page 170: ...146 SAN512B 6 Installation Service and User Guide...
Page 184: ...160 SAN512B 6 Installation Service and User Guide...
Page 196: ...172 SAN512B 6 Installation Service and User Guide...
Page 208: ...184 SAN512B 6 Installation Service and User Guide...
Page 258: ...234 SAN512B 6 Installation Service and User Guide...
Page 274: ...250 SAN512B 6 Installation Service and User Guide...
Page 285: ......
Page 286: ...IBM Part Number 01JC152 Printed in USA SC27 8966 02 1P P N 01JC152...