Installing the server
Caution
Four persons are required to install the server in the
rack.
To install the server in the rack:
1. If the four lift handles are already not installed on the
server, install the handles now.
a. Press in on the sides of the lift handle near the
tabs and insert the handle tabs into the slots on
the sides of the server.
b. Move the handle up in the slots until the hooked
part of each tab is inside the server.
c. Release the pressure on the sides of the handle.
102
Netfinity Server HMM
Summary of Contents for 8500R - Netfinity - 8681
Page 2: ......
Page 8: ...vi Netfinity Server HMM...
Page 25: ...1 LVD low voltage differential Netfinity 8500R Type 8681 17...
Page 62: ...Caution Use safe practices when lifting 54 Netfinity Server HMM...
Page 242: ...I O Housing Assembly 1 2 3 4 5 6 7 234 Netfinity Server HMM...
Page 261: ...Related service information 253...
Page 262: ...254 Netfinity Server HMM...
Page 263: ...Related service information 255...
Page 264: ...256 Netfinity Server HMM...
Page 265: ...Related service information 257...
Page 278: ...270 Netfinity Server HMM...
Page 279: ...Related service information 271...
Page 280: ...272 Netfinity Server HMM...
Page 290: ...IBM Part Number 37L5123 Printed in U S A S37L 5123...