SystemGuard Test Groups
A-3
SystemGuard Test Group Descriptions
The following is a description of the different test groups and the tests available under them.
All of these tests are performed automatically at Power On with default parameters. They
can also be performed selectively (selection of test group/subtest/parameter) with user
configured parameters, under the control of the Off Line Test monitor. This is available as
one of the options in the Maintenance Menu under SystemGuard.
BUMP Quick I/O Tests Group
These tests are performed by the BUMP and are launched at Power-On under the control of
Off Line Test monitor, under the Maintenance Menu. These tests check the accessibility and,
the functions of the standard and direct I/O components from the BUMP. This group contains
the following list of tests.
Debug Asynchronous Line Test
This test checks the BUMP availability and access to the Flash EPROM. It consists of the
following sub-test.
Minimum Core Test
This test is performed at Power On. A specific text on the Debug
console is printed. The operator is required to check the result.
Summary of Contents for 7015-R30
Page 1: ...7015 Models R30 R40 and R50 CPU Enclosure Installation and Service Guide...
Page 10: ...x Service Guide...
Page 14: ...xiv Service Guide...
Page 34: ...1 20 Service Guide...
Page 214: ...6 10 Service Guide Detail 5 CPU Module 2 of 3 26 27 29 30 31 32 33 34 28 35...
Page 216: ...6 12 Service Guide Detail 6 CPU Module 3 of 3 36 37...
Page 252: ...B 8 Installation and Service Guide...
Page 288: ...Service Guide D 30...
Page 299: ......