Figure 85. Reorienting the door latch
7. Install the door back onto the hinge.
8. Adjust the latch such that the door latches securely.
Ruggedized kit for the 7965-S42 rack
You might need to open the ruggedized brace for maintenance or remove or replace a part in the
ruggedized kit. This section includes procedures so that you can perform these tasks. The ruggedized kits
122 Power Systems: Racks and rack features
Summary of Contents for 7014 T00
Page 1: ...Power Systems Racks and rack features IBM ...
Page 4: ...iv ...
Page 14: ...xiv Power Systems Racks and rack features ...
Page 151: ...Figure 98 Removing the remaining screws 7 Lift off the top cover Racks and rack features 137 ...
Page 167: ...Figure 110 Installing the inner hose panel Racks and rack features 153 ...
Page 184: ...170 Power Systems Racks and rack features ...
Page 195: ......
Page 196: ...IBM ...