Figure 42. Attaching the long mounting brackets to the PDU and PDU+
If you are installing the Intelligent Switched PDU or Intelligent Switched PDU+ adjustable mounting
rails, complete the following tasks:
a. Assemble the adjustable mounting rail by using the three screws that are included with the
mounting kit.
b. Attach the adjustable mounting rails to each side of the PDU chassis by using the six screws that
are included with the mounting kit.
Racks and rack features 59
Summary of Contents for 7014 T00
Page 1: ...Power Systems Racks and rack features IBM ...
Page 4: ...iv ...
Page 14: ...xiv Power Systems Racks and rack features ...
Page 151: ...Figure 98 Removing the remaining screws 7 Lift off the top cover Racks and rack features 137 ...
Page 167: ...Figure 110 Installing the inner hose panel Racks and rack features 153 ...
Page 184: ...170 Power Systems Racks and rack features ...
Page 195: ......
Page 196: ...IBM ...