attaches the hinge to the rack from under the rack top hat. Use a torque screwdriver to tighten the
screws to 2.5 Nm ± 0.2 Nm (22.1 inch lbs ± 1.8 inch lbs).
22. When the heat exchanger is latched, make sure that there is a tight fit between the heat exchanger
and the rack frame. Loosen or tighten the latch adjustment screw as required.
23. Install the lower air baffle in the rear of the rack. Secure the air baffle to the rack with two M5 and
two M6 screws, as shown in Figure 108 on page 151. Use a torque screwdriver to tighten the screws
to 2.5 Nm ± 0.2 Nm (22.1 inch lbs ± 1.8 inch lbs).
Figure 108. Aligning the bottom hole with the hinge pin
24. Install the hose guide peg by using one M5 screw. Use a torque screwdriver to tighten the screw to
2.5 Nm ± 0.2 Nm (22.1 inch lbs ± 1.8 inch lbs).
25. Route the hoses under the rack. Ensure that one hose is on each side of the hose guide peg.
26. Couple the hoses, as shown in Figure 109 on page 152.
Racks and rack features 151
Summary of Contents for 7014 T00
Page 1: ...Power Systems Racks and rack features IBM ...
Page 4: ...iv ...
Page 14: ...xiv Power Systems Racks and rack features ...
Page 151: ...Figure 98 Removing the remaining screws 7 Lift off the top cover Racks and rack features 137 ...
Page 167: ...Figure 110 Installing the inner hose panel Racks and rack features 153 ...
Page 184: ...170 Power Systems Racks and rack features ...
Page 195: ......
Page 196: ...IBM ...