![Hurco AB6 Installation Manual Download Page 159](http://html1.mh-extra.com/html/hurco/ab6/ab6_installation-manual_2187300159.webp)
Installation Manual
3-2
Revision E
Hurco
Y-Axis Downacting Hydraulic
1.
Every six months check the linear scale mounting bolts,
linkage rod, rod mounting bolts, and bracket for looseness.
Tighten as required.
2.
Every three months remove the linear scale cover and wipe
down the linear way with a soft, lint-free cloth. Apply a light
film of lithium grease.
3.
Every six months inspect the Y-axis linear scale harness for
possible cuts in the cable insulation or wires. Replace if
damaged.
Y-Axis Positive Stop
1.
Every six months inspect belts, couplings, and pulleys for
wear or looseness. Tighten as necessary.
2.
Every six months inspect the Y-axis harness for possible
cuts in the cable insulation or wires. Replace if damaged.
Y-Axis Upacting
1.
Wipe down the lead screw and carriage ways with a soft,
lint-free cloth. Apply a light film of S.A.E. #10 oil to the
lead screw on a weekly basis; if the shop environment is
dirty, clean the lead screw daily.
2.
Every six months inspect belts, couplings, and pulleys for
wear or looseness. Tighten as necessary.
3.
Every six months inspect the Y-axis harness for possible
cuts in the cable insulation or wires. Replace if damaged.
Summary of Contents for AB6
Page 3: ...iv Revision E Hurco...
Page 5: ...vi Revision E Hurco...
Page 13: ...Installation Manual xiv Revision E Hurco...