2.2.6 Installing Power Cables - DC Power Distribution
In standard configuration, the USG9580 has eight PEM modules. Each PEM module requires
an NEG DC power cable and an RTN DC power cable. This section describes how to connect
power cables to the two DC supply modules.
Context
DANGER
Never install power cables when the power is on.
Before installing power cables, ensure that the device is adequately grounded.
l
There is a length of copper core inside the cable. Do not connect anything to the core.