1.5.2 1.25 Gbit/s SFP/eSFP Optical Module.................................................................................................................... 199
1.5.3 10 Gbit/s XFP Optical Module................................................................................................................................205
1.5.4 10 Gbit/s SFP+ Optical Module.............................................................................................................................. 211
1.5.5 40 Gbit/s CFP Optical Modules...............................................................................................................................217
1.5.6 40 Gbit/s QSFP+ Optical Module........................................................................................................................... 219
1.5.7 100 Gbit/s CFP Optical Modules.............................................................................................................................224
2.1 Preparing for the Installation...................................................................................................................................... 229
2.1.1 Preparing Technical Documents.............................................................................................................................. 229
2.1.2 Preparing Tools and Meters..................................................................................................................................... 229
2.1.3 Surveying the Installation Environment.................................................................................................................. 231
2.1.4 Unpacking and Checking the Products....................................................................................................................231
2.1.4.1 Checking the Package Container..........................................................................................................................232
2.1.4.2 Unpacking the Wooden Case................................................................................................................................233
2.1.4.3 Unpacking the Carton...........................................................................................................................................236
2.1.4.4 Checking the Boards.............................................................................................................................................237
2.2 Installing USG9580.................................................................................................................................................... 238
2.2.1 Deployment Requirements...................................................................................................................................... 238
2.2.2 Installing the Chassis into the Cabinet.................................................................................................................... 240
2.2.3 Installing the PGND Cable...................................................................................................................................... 244
2.2.4 Installing Boards and Subcards............................................................................................................................... 245
2.2.5 Installing Chassis Components................................................................................................................................247
2.2.6 Installing Power Cables - DC Power Distribution...................................................................................................250
2.2.7 Installing Power Cables - AC Power Distribution...................................................................................................253
2.2.8 Connecting Network Cables....................................................................................................................................256
2.2.9 Connecting Optical Fibers....................................................................................................................................... 258
2.2.10 Post - Installation Checklists................................................................................................................................. 261
2.2.11 Powering On the USG9580 - DC Power Distribution...........................................................................................262
2.2.12 Powering On the USG9580 - AC Power Distribution...........................................................................................265
2.3 Installing USG9560.................................................................................................................................................... 268
2.3.1 Preparing the Site.....................................................................................................................................................269
2.3.2 Installing the Chassis into the Cabinet.................................................................................................................... 270
2.3.3 Connecting the PGND Cable...................................................................................................................................274
2.3.4 Installing Boards and Subcards............................................................................................................................... 275
2.3.5 Installing Chassis Components................................................................................................................................277
2.3.6 Installing Power Cables - DC Power Distribution...................................................................................................278
2.3.7 Installing Power Cables - AC Power Distribution...................................................................................................281
2.3.8 Connecting Network Cables....................................................................................................................................284
2.3.9 Connecting Optical Fibers....................................................................................................................................... 286
2.3.10 Checking After Installation................................................................................................................................... 289
2.3.11 Powering On the USG9560 - DC Power Distribution...........................................................................................290
2.3.12 Powering On the USG9560 - AC Power Distribution...........................................................................................293
HUAWEI USG9500 Series
Hardware Guide
Contents
Issue 03 (2017-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
viii