
Parameter
Description
Electricity price/kWh
Set this parameter to the local
electricity price, which is used to
calculate the converted revenue of the
energy yield.
CO2 emission reduction coefficient
Set this parameter based on the local
standard.
Save Period
Parameter
Description
Performance data save period
Set this parameter to the save period
of performance data. After the setting,
the data will be displayed accordingly
on the performance data page.
6.3.2 Setting Parameters for Connecting to the Management
System (V300R001C00)
Procedure
Step 1 Set up a network connection.
●
Method 1: When the SmartLogger connects to the management system over
the 4G/3G/2G network, set mobile data parameters and click Submit.
Figure 6-28 Setting mobile data parameters
SmartLogger3000
User Manual
6 WebUI Operations
Issue 10 (2022-08-20)
Copyright © Huawei Technologies Co., Ltd.
94