RRU3832&RRU3632
Installation Guide
About This Document
Issue 05 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
iii
Organization
1 Changes in the RU3832&RU3632 Installation Guide
This chapter describes the changes in the
RU3832&RU3632 Installation Guide
.
This chapter describes the reference documents, tools, and instruments that must be ready
before the installation. In addition, it specifies the skills and prerequisites that installation
engineers must have.
3 Information About the Installation
Before installing an RU, you must be familiar with its exterior, ports, indicators, installation
options and installation clearance requirements.
This chapter describes how to unpack and check the delivered equipment to ensure that all the
materials are included and intact.
The installation process involves installing an RU and RU cables, checking the RU hardware
installation, and powering on the RU.
6 (Optional) Installing the Plastic Shells of the RU
This section describes the procedure for installing the plastic shells of the RU.
7 Hoisting an RU and Related Cables onto a Tower
This section describes the procedure for hoisting an RU and related cables onto a tower and
the precautions that must be taken.
This chapter describes the procedure for installing the RU. The procedure for installing the
RU varies depending on installation options.
This chapter describes the procedure for installing RU cables.
10 Checking the RU Hardware Installation
After an RU is installed, check the hardware installation.
After all the devices are installed, check the power-on status of an RU.
This section describes the procedure for adding an easy power receptacle (pressfit type)
connector.