RRU3832&RRU3632
Installation Guide
9 Installing RU Cables
Issue 05 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
110
Procedure
Step 1
Close the clips for the installed cables. Use an M4 torque screwdriver to tighten the screws on
each clip to 1.4 N·m (12.39 lbf·in.), as shown in
Ensure that the exposed shield layer of the power cable is properly tightened using the clip.
Figure 9-26
Closing clips
Step 2
Insert waterproof blocks into vacant cable troughs in the cabling cavity, as shown in
Ensure that cables and waterproof blocks are properly inserted into troughs.