Figure 5-28 Removing an indicator board
Step 6 Place the removed indicator board in an ESD bag.
----End
5.4.2 Installing an Indicator Board
This topic describes how to install an indicator board.
Scenarios
Install an indicator board if the original one has failed.
Prerequisites
Conditions
You have powered off the RH8100 V3. For details, see
. Then you have removed all power cables from the server.
Data
RH8100 V3 Server
User Guide
5 Removing and Installing Parts of the RH8100 V3
Issue 30 (2019-12-19)
Copyright © Huawei Technologies Co., Ltd.
142