NO TICE
To ensure optimal heat dissipation, do not block the air exhaust vents of PSUs.
3.4.8 Verifying Cable Connections
Before verifying cable connections, ensure that the power is off. Any incorrect or
loose connection may cause personal injury or equipment damage.
lists the cable connection checklist.
Table 3-3 Cable connection checklist
Item
Description
Power cable
The power cable is connected correctly to the rear of the
chassis.
Network cable
Network cables are connected correctly to the management
Ethernet ports or service Ethernet ports on the rear panel of
the chassis.
Ground cable
The server is grounded through the cabinet. Ensure that the
cabinet is properly grounded.
RH8100 V3 Server
User Guide
3 Installing the RH8100 V3
Issue 30 (2019-12-19)
Copyright © Huawei Technologies Co., Ltd.
103