NetCol5000-A020 Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
45
Step 3
If any welding problem occurs, find the leakage and weld it again. If pressure retainability
meets requirements, reclaim nitrogen from the needle valves.
----End
3.8 Electrical Connection
3.8.1 Cable Installation
Operation Procedure
Keep cables away from the compressors, fans, and copper pipes (otherwise, take protective
measures), and connect cables properly.
1.
Connect power cables to the indoor unit.
2.
Connect power cables to the outdoor unit. (See
NetCol500 Outdoor Unit User Manual
).
3.
Install the voltage jumper.
4.
Connect outdoor unit on/off signal cable and water sensor.
5.
Connect Teamwork networking and host monitoring cable.
6.
Install an T/H sensor.
For details about cable specifications, see
Table 3-7
.