NetCol5000-A020 Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
37
1.
Remove the screws from the fixing plate, as shown in
Figure 3-18
.
Figure 3-18
Removing the screws from the fixing plate
2.
Install side panels.
3.
At least four persons are required to lift the equipment from the pallet to the ground.
4.
Adjust the leveling feet using an adjustable wrench, as shown in
Figure 3-19
.
Figure 3-19
Leveling feet
Step 8
Installing an enclosure frame (optional).