NetCol5000-A020 Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
21
Figure 3-3
Routing drainpipes
(1) Copper pipe with an outer
diameter of 3/4 inch
(2) Hose clamp
(3) Hose with an inner diameter of 3/4
inch (for example, EPDM)
(4) Connector for rigid pipes, 3/4 inch copper
pipe with 3/4 inch BSPP inner thread connector
(5) Rigid pipe, PP-R or C-PVC, with a
3/4 inch outer thread connector
(6) Hose with an inner diameter of 3/4 inch (for
example, EPDM)
Part 1 (in the dot-line box) is a port on the equipment. Parts 2 and 4 are mandatory. Other parts do not
need to be configured.
Pipe Support Preparations
Figure 3-4
shows the support for refrigerant and water pipes. Determine detailed
specifications based on onsite situation. Stainless steel 304 for pipe support and pipe clamp
are recommended.
Figure 3-4
Pipeline support