NetCol5000-A020 Air Cooled In-row Precision Air
Conditioner
User Manual
5 System Operation and Maintenance
Issue 01 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
109
5.6.5 Electric Heater
Prerequisites
Recommended tools: a Phillips screwdriver, diagonal pliers, waterproof adhesive, cable
ties.
The electric heater needs to be replaced.
A spare and functional electric heater is available.
Context
The front door is opened for front-access maintenance.
Before replacing the electric heater, make sure that the electric heaters are not hot to touch.
When removing the electric heaters, avoid dead bends on the capillary tube of the
temperature switch.
The electric heater rack is inside the NetCol5000-A020. Exercise caution during
maintenance to prevent internal components from scratches or damage
Procedure
Step 1
Tap
Shutdown
on the main menu, switch off the main circuit breaker QF1 and the front end
circuit breaker.
Exercise cautions when performing operations on the equipment because the equipment is
under power.
Remove the rear door and the air filters when switch off the main circuit breaker QF1.
Step 2
Remove the front door, control cables, ground cables, and connectors connecting to the
bottom four fans.
Step 3
Remove screws fixing sheet metals of the air inlet temperature sensor probe at the bottom of
the right column using a Phillips screwdriver, as shown in 1 of
Figure 5-8
.