FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
3 Hardware Installation
Issue 10 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
64
Figure 3-38
Installing floating nuts
Step 4
Take air director guide rails from the smart cooling product fitting bag and secure the guide
rails using five M5x10 screws, as shown in
Figure 3-39
Installing air director guide rails
Step 5
Push the indoor unit into the cabinet bottom along the guide rails, and secure the indoor unit
using eight M6x12 screws, as shown in
When pushing the indoor unit, ensure that the cables reserved at the weak-current power cable
hole in the rear of the cabinet are not affected.