Installation Guide (Six Fans)
3 Hardware Installation
Issue 10 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
45
3.4.2 Adjusting the Positions of Battery Cabinet Side Panels
If an auxiliary battery cabinet (without circuit breakers) is deployed in the Smart Module,
remove the panel on one side of the main battery cabinet and install the side panel on the
outer side of the auxiliary cabinet. Ensure that there are side panels on the outer sides of the
main and auxiliary battery cabinets and there is no side panel between the battery cabinets.
For details, see
3.4.1 Adjusting the Positions of IT Cabinet Side Panels
3.5 Installing a Cabinet
Prerequisites
The floor levelness meets engineering requirements.
Context
To position cabinets, perform the following steps:
1.
Obtain a marking-off template for 600 mm wide cabinets from the Converged Cabinet
fitting bag.
2.
Obtain a marking-off template for 800 mm wide cabinets from the 800 mm wide IT
cabinet fitting bag.
3.
Mark the positions for end cabinets using the marking-off templates according to the
engineering layout diagram.
4.
Place the end cabinets at the installation positions accurately.
5.
Use the end cabinet as a basis and place other cabinets at their installation positions.
Procedure
Step 1
Place the end cabinets at the installation positions accurately.
Step 2
Level the cabinets using a wrench, as shown in