FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
2 Installation Preparations
Issue 10 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
22
Figure 2-2
Component layout
(1) Binding plate
(2) Cabinet sealing plate
(3) IT cabinet
(4) Converged Cabinet
(5) Battery cabinet
(6) PAD
(7) Camera
The IT cabinet to the left of the Converged Cabinet houses various components depending on
the configurations.