
FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
4 Preparations for Power-On Commissioning
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
22
Figure 4-5
Opening the overhaul valve for an expansion tank
Step 2
Open the automatic exhaust valve for the expansion tank and turn the nut counterclockwise,
as shown in
Figure 4-6
Opening the automatic exhaust valve for an expansion tank