FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
About This Document
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
ii
About This Document
Purpose
This document describes how to power on and commission the FusionModule1000B
prefabricated modular data center solution (FusionModule1000B for short) in terms of
power-on commissioning preparations, checking items and precautions, power-on check,
power-on commissioning, joint commissioning, and power-off. This document also describes
the power-on commissioning, joint commissioning, and power-off methods for core
components of the solution. It provides you a quick grasp of the commissioning method.
Intended Audience
This document is intended for:
Commissioning engineers
Technical support engineers
System engineers
Maintenance engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol
Description
Indicates an imminently hazardous situation which, if
not avoided, will result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, may result in minor or moderate injury.